Master Scheduler
Company: Stored Energy Systems
Role summary
Master Scheduler is a role at Stored Energy Systems in Longmont, Colorado, United States (on-site). Posted 2026-08-25. Salary: USD 93,000–110,000 per year. Experience level: 5-10.
- Job title
- Master Scheduler
- Company
- Stored Energy Systems
- Location
- Longmont, Colorado, United States
- Work arrangement
- on-site
- Category
- Software Engineering
- Salary
- USD 93,000–110,000 per year
- Experience level
- 5-10
- Date posted
- 2026-08-25
Stored Energy Systems is looking for someone to take the reins on their production planning in a role that offers a strong salary and plenty of professional autonomy. If you enjoy organizing complex timelines and keeping a manufacturing environment running smoothly, this is a great opportunity to make a real impact on their operations.
Job description
Who We Are
Stored Energy Systems (SENS) is an award-winning manufacturer of premium quality power conversion products located in Longmont, CO. In business for over 50 years, SENS is the market leader with a proven track record of providing highly reliable battery chargers, DC power systems, and related products to industrial markets. For more information on our company please see our web site at www.sens-usa.com .
View the SENS Product Catalog
Summary
SENS is seeking a Master Scheduler to own the master production schedule and serve as the business lead for our ERP planning and scheduling system (Infor SyteLine). This role balances customer ship dates, forecasting, material availability, and shop floor capacity to produce a realistic, trusted production schedule, and works closely with IT, Production, and Manufacturing Engineering to keep the planning system's configuration and data accurate.
This role requires a self-starter – someone highly motivated to take responsibilities on, act quickly, and provide the most possible data to help make tough decisions quickly. Scheduling requires critical thinking, problem-solving, and the ability to synthesize inputs across most departments of the business to prioritize production outputs for our customers, ensuring on-time delivery stays above 95% throughout the year.
Responsibilities
Own and maintain the master production schedule across all product lines, balancing customer ship dates, material availability, and shop floor capacity.
Serve as the business owner of SyteLine's planning and scheduling configuration, including APS/MRP settings, planning parameters, work center and resource group capacity data, and Planning BOMs.
Investigate planning and scheduling discrepancies, such as unexpected demand (drop-in’s from Sales/Order Management, expedite requests, etc.) or rescheduling behavior, to identify and resolve root causes, while maintaining OTD to SENS customers.
Facilitate alignment between Sales, Order Management, Production, and Procurement on order priorities, schedule changes, and capacity constraints.
Maintain Planning BOMs and item planning parameters — forecast method, lead time, reorder logic, safety stock — so they reflect current volume and product mix.
Maintain documentation and SOPs for planning and scheduling processes and system configuration.
Monitor exception messages and shortage alerts to ensure risks are surfaced to Planning, Production, and Procurement before they reach the shop floor.
Train planners, schedulers, and supervisors on the scheduling system and how to act on its output.
Report on schedule attainment, forecast accuracy, and other planning KPIs to Operations leadership.
<span style="box-sizing: border-box; outline: none; --tw-shadow: 0 0 #0000; --tw-ring-inset: ; --tw-